Activity
Water civil engineering
Clients
Municipal
Type of project
To secure the drinking water supply for Avranches and Granville, SMPGA selected SADE to create two 500m3 equalising reservoirs and connected pumping station as well as two river water intakes – flow of 400m3/h with connected water pumping and quality control system for two new treatment plants under construction.