Activity
Hydraulic (networks)
Clients
Municipal
Type of project
SIAAP entrusted SADE Group with improving the Méry branch wastewater transfer network in order to increase the Pierrelaye plant discharge rate.
To increase its pumping capacities, the project consisted in installing 1,900m of 600mm-diameter GRP pipe on stainless steel supports inside the existing 2,000mm-diameter collector with the HDPE 560mm-diameter pipe in service on the ground.