Commissioning of a drinking water treatment plant
Activity
Water treatment (plants)
Clients
Municipal
Type of project
SADE Senegal designed and built the new Saint-Louis drinking water treatment plan, from catchment of raw water in the Senegal river to discharge of treated water.
SADE Engineering commissioned the plant, carrying out:
- verification of compliance of the assembly and hydraulic, electrical and pneumatic connections with relation to these plans and manufacturer instructions;
- verification of the proper working of electromechanical equipment and proper reporting of information from instrumentation to automatons;
- instrumentation settings;
- set-up of installation in manual mode and operator training;
- drawing up of test reports.
Téléchargez la fiche de référence